Residential Dumpster – It is important to arrange garbage collection and removal even before the commissioning of a newly constructed residential building.
The availability of a site for the positioning of tanks, the size, distance from residential buildings, the volume of appropriate containers, and their number are all controlled by construction norms and rules (SNiP). There are some variations in the criteria for the facilities of waste collection points in apartment buildings and the private sector. Waste container calculations for residential buildings done during the construction planning period.
Standards For The Placement Of Household Dumpster
Each settlement has its own set of rules for the amount of solid domestic waste (MSW) that can be accumulated per person. As a result, norms for the number of garbage containers are created, as well as the timing of their removal. These indicators are determined using the statute and the rules set out by SNiP, SanPiN 42-128-4690-88m 1988 and 2.1.2.2645-10 2010.
To determine the number of garbage containers needed for a residential building:
N = 1.25 * P * t / E, where N = 1.25 * P * t / E
The required number is N.
The total daily amount of solid waste collection (P).
T – garbage collection frequency
E is the container’s volume in litres;
1.25 – unbalanced waste accumulation coefficient, density, and loading.
What Factors Do You Consider When Selecting a Waste Collection Dumpster?
Consider the following parameters when choosing a container:
- What is the substance that they are made of? (plastic or metal).
- 0.8–1 m 3 is the volume. It is dependent on the population density of the surrounding area.
- Securely sealed with a lid that will keep the contents dry in the event of rain.
- If you pick the wrong tank, for example, by making it too small, you will have to empty the solid waste often (up to several times a day). Furthermore, if you have a big container and only use it occasionally, the waste can begin to decompose. There would be an unpleasant odour and an unsanitary atmosphere as a result of this.
Characteristics Of The Container Position
Before the buildings places into service, calculates the number of garbage containers required and arranges the zone for their installation. The selection of a site for the development of a solid waste container zone is coordinate with an approved planner, local officials, and representatives from the sanitary and disease authorities.
Then they have garbage removal and care for ZhKO or HOA waste bins. These organisations enter into arrangements with specialist companies if they do not have their own funding for solid waste removal.
The area where waste bins will be installed has been prepared in compliance with sanitary and hygienic standards:
- Place the tanks on a concrete or asphalt surface. It should also grow to a height of 20 cm above the main road surface.
- About 20 to 100 meters away from residential buildings, it must be eliminated.
- Fence off the Three sides of the waste bin area . The fence can reach a height of 150 cm.
- Determine the number of trash cans needed . And the amount of household waste collected by tenant each year. Per yard, 2 to 5 containers can be installed.
- Designing of the tanks in such a way that garbage trucks have easy access to them.
- No tanks installation near playgrounds, flower beds, sidewalks, or race tracks for children. If compliance with this requirement is impossible, a special commission determines the location of the waste bins field.
For a free quote on your next local dumpster rental, give us a call now!